10 Projects Covering More Than 98,000 Hectares

Purepoint-ISO Joint Venture

Aligns With Some of the World's Largest and Most Significant Uranium Deposits

About Purepoint | IsoEnergy JV

IsoEnergy and Purepoint Uranium Form 50 – 50% Joint Venture Covering Over 98,000 Hectares in the Eastern Athabasca Basin

The Joint Venture consolidates 10 high-valued uranium projects into three distinctive areas in Saskatchewan’s eastern Athabasca Basin: the Dorado Project, the Aurora Project and the Celeste Block.

Dorado Project: Unlocking the Potential of the Larocque Trend

  • Positioned along the renowned Larocque conductive corridor (the “Larocque Trend”), home to IsoEnergy’s Hurricane Deposit, the Dorado Project consolidates Turnor Lake, Geiger, Edge and most of Full Moon into a single high-priority exploration initiative 
  • Exploration will focus on the high-priority target zones defined by graphitic conductors that wrap around a central granitic dome. A unified approach will integrate and re-evaluate all historical geophysical work and drill hole geology across the properties.
  • The Larocque Trend extends across the Turnor Lake property to the northern boundary of Full Moon, located 14 kilometers east of the Hurricane Deposit. Drilling has revealed a shallow vertical depth to the unconformity, ranging from just 27 to 133 metres and several highly prospective yet untested zones remain. Additionally at Geiger, historical drilling intersected high-grade basement-hosted uranium mineralization, including 2.74% U₃O₈ over 1.2 metres in drill hole HL-50 along the H11 South conductor (IsoEnergy press release dated January 25, 2018). Geiger is characterized by 20 kilometers of graphitic conductors, with significant untested gaps of up to 1,000 metres, presenting exceptional exploration potential.
  • Approximately 5,400 metres in 18 drill holes are planned for 2025.

Aurora Project: Shallow Uranium Targets Along the Athabasca Basin’s Edge

  • The remaining claims east of Dorado now make up the Aurora Project, including, part of Full Moon, Red Willow, and Collins Bay Extension, presenting significant near-surface uranium potential in proximity to McClean Lake mine, and Rabbit Lake mine and mill.
  • An airborne geophysical survey is planned for 2025.

Celeste Block: Preparing Southern Targets for Exploration

  • Incorporates Thorburn, North Thorburn, Madison and 2Z properties, which cover portions of conductor trends east of the Cigar Lake Mine and southwest of the Rabbit Lake and McClean Lake mines (Figure 1). Target depth is relatively shallow as sandstone thickness ranges between 60 metres at Madison in the east to 350 metres at Thorburn in the west.
  • Near-term efforts will focus on drill testing recent geophysical results at Madison where sandstone cover is thin, and limited historical drilling has been completed, with just one hole drilled since 1989.
  • Approximately 800 metres in 4 drill holes are planned for 2025.

sign-up to receive information as it happens

about us

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) is a focused explorer with a dynamic portfolio of advanced projects within the renowned Athabasca Basin in Canada.

The most prospective projects are actively operated on behalf of partnerships with industry leaders including Cameco Corporation, Orano Canada Inc. and IsoEnergy Ltd. Additionally, the Company holds a promising VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Corporation’s McIlvena Bay project.

Through a robust and proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the globe’s most significant uranium districts.

Events

November 20 - 23, 2024

New Orleans Investment Conference - New Orleans, USA

December 1 - 2, 2024

The Northern Miner International Metals Symposium - London, UK

December 3 - 6, 2024

Mines and Money @ Resourcing Tomorrow - London, UK

March 2 - 5, 2025

PDAC 2025 - Toronto, Canada

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00