100% Owned

Russell South

5 Drill Ready Targets Identified

About Russell South

The 100% owned Russell Lake Project is located near the south-central edge of the Athabasca Basin covering an area of 13,320 hectares, within a favourable geologic area since it’s close to the southern edge of the Athabasca Basin that has relatively shallow drill targets and nearby uranium deposition.

The project adjoins Cameco’s Key Lake project on which the Key Lake Mine produced over 200 million pounds of uranium at a grade averaging 2.3% U3O8 between 1983 and 1997. In addition, the project adjoins the Moore Lake Project owned by Skyharbour Resources Ltd. with their high-grade Maverick Zone and Rio Tinto’s Russell Lake Project to the west and south.

Five target areas have now been identified at the project. The four eastern targets are based on the recent results from the airborne geophysical survey. The target zones are coincident airborne gravity low and magnetic low responses, interpreted as favourable rock types and/or alteration zones, that are proximal to north-northwest trending structures. The western Treleaven target area hosts historic coincident geochemical anomalies possibly related to a dilational zone lying between the interpreted north-south faults.

Gallery

Russell South Location in the Athabasca Basin
Location Map with Neighbours
Russell South Gravity Map
Russell South Magnetic 1st Vertical Derivative

sign-up to receive information as it happens

about us

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of nine advanced projects in Canada’s Athabasca Basin.

In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds seven, 100% owned projects with proven uranium rich targets and one VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Corporation's McIIvena Bay Project.

Upcoming Events

November 20 - 23, 2024

New Orleans Investment Conference

March 2 - 5, 2025

PDAC 2025

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00