100% Owned

Tower Project

Geologically Controlled by the Tabbernor Fault System

About the Tower Project

Originally known as the “MillKey” Project, the 100%-owned Tower Project consists of 10 claims totaling 23,159 hectares located within the Tabberbor Fault System.

The Tabbernor Faults are a deep seated, 1,500 kilometre crustal shear system that runs north through the Athabasca Basin. The system not only hosts over 80 historic mines and gold occurrences but as well cross cuts the Basin’s mine trend aligning itself with 8 of the Basin’s largest uranium discoveries.

During the summer of 2022, an exploration program consisting of a 930 line-kilometre, airborne VTEM™survey over the Tower project. Short EM conductors were identified during the survey.

The strong north-south trend of the major fault interpreted to bisect the project is thought to be part of the regionally significant, deep-seated, Tabbernor Fault System. The north-south trending structural corridor is interpreted to be associated with the Key Lake mine located to the north.

The Tabbernor Fault System is a geological feature located in close proximity to the Athabasca Basin in Saskatchewan. It is characterized by a network of interconnected faults that run through the region. These faults are primarily oriented in a northeast-southwest direction and have played a significant role in shaping the geological history of the area.

Geological studies and exploration efforts have focused on understanding the intricate nature of the Tabbernor Fault System to identify potential areas with high uranium mineralization. By studying the fault system’s geometry, displacement patterns, and associated rock formations, we can gain valuable insights into the location and extent of uranium deposits within the Athabasca Basin.

The geological significance of the Tabbernor Fault System and its potential for hosting valuable mineral deposits make it a focal point for ongoing exploration and further studies within the region.

Tower Project News

Gallery

Tower Location in the Athabasca Basin

sign-up to receive information as it happens

about us

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) is a focused explorer with a dynamic portfolio of advanced projects within the renowned Athabasca Basin in Canada.

The most prospective projects are actively operated on behalf of partnerships with industry leaders including Cameco Corporation, Orano Canada Inc. and IsoEnergy Ltd. Additionally, the Company holds a promising VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Mining Corporation’s McIlvenna Bay project.

Through a robust and proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the globe’s most significant uranium districts.

Events

November 20 - 23, 2024

New Orleans Investment Conference - New Orleans, USA

December 1 - 2, 2024

The Northern Miner International Metals Symposium - London, UK

December 3 - 6, 2024

Mines and Money @ Resourcing Tomorrow - London, UK

March 2 - 5, 2025

PDAC 2025 - Toronto, Canada

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00