100% Owned

Carson Lake

3 Drill Ready Targets Identified

About Carson Lake

The 100%-owned Carson Lake Project consists of 2 claims totaling 4,972 hectares on the eastern side of Canada’s Athabasca Basin. It adjoins ValOre Metals Hatchet Lake Project (optioned to Azincourt Energy) on the north-eastern edge of the Athabasca Basin.

In the summer of 2022, Purepoint completed airborne Gravity Gradiometer, Gravity and Magnetic Surveys across Carson Lake Project. A total of 390 line-kilometres were flown in 2 production flights to complete the block. Final interpretation in conjunction with previous surveys have outlined three targets at Carson Lake.

Exploration is focused on basement-hosted uranium mineralization targets similar to the Eagle Point deposit situated 50 km south-southwest of Carson Lake.

The project covers a historic airborne geophysical electromagnetic (EM) survey that outlined a strong northeast trending EM conductor approximately 10 km in length. The survey covered two of the primary target areas.

To the north, the Killock target is presumed to be graphitic pelite that has been incorporated into the north-south trending Killock Fault. Brittle structures such as the Killock fault intersecting ductile rock types, such as graphitic pelite, can create favourable dilation zones and allow uranium-rich fluids to become trapped.

The Lejour Fault crosscuts the main conductive trend. Gravity results suggest that the conductive trend is associated with a lithologic contact. Interpretation of the EM results suggests the single conductor west of the Lejour Fault is present as two parallel conductors east of the fault.

The lower priority Trunk target is a 1km long, sigmoidal shaped EM conductor located within the southeast portion of the project.

Gallery

Carson Lake Location in the Athabasca Basin
Carson Lake - VTEM EM Results (Hathor, 2008)
Carson Lake - 2022 Gravity Map
Carson Lake - 2022 Magnetic 1st Vertical Derivative

sign-up to receive information as it happens

about us

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) actively operates an exploration pipeline of nine advanced projects in Canada’s Athabasca Basin.

In addition to its flagship joint venture project at Hook Lake with partners Cameco and Orano and a second joint venture with Cameco at Smart Lake, Purepoint also holds seven, 100% owned projects with proven uranium rich targets and one VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Corporation's McIIvena Bay Project.

Upcoming Events

November 20 - 23, 2024

New Orleans Investment Conference

March 2 - 5, 2025

PDAC 2025

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
-
00:00
00:00
Update Required Flash plugin
-
00:00
00:00