Celeste Block Project
Preparing Southern Targets for Exploration
About Celeste Block
IsoEnergy and Purepoint Uranium formed a 50 – 50% Joint Venture covering over 98,000 hectares in the eastern Athabasca Basin. The Joint Venture consolidates 10 high-valued uranium projects into three distinctive areas in Saskatchewan’s eastern Athabasca Basin: the Dorado Project, the Aurora Project and the Celeste Block.
The Celeste Block incorporates Thorburn, North Thorburn, Madison and 2Z properties, which cover portions of conductor trends east of the Cigar Lake Mine and southwest of the Rabbit Lake and McClean Lake mines. Target depth is relatively shallow as sandstone thickness ranges between 60 metres at Madison in the east to 350 metres at Thorburn in the west.
Near-term efforts will focus on drill testing recent geophysical results at Madison where sandstone cover is thin, and limited historical drilling has been completed, with just one hole drilled since 1989.
Approximately 800 metres in 4 drill holes are planned for 2025.
Gallery
sign-up to receive information as it happens
about us
Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) is a focused explorer with a dynamic portfolio of advanced projects within the renowned Athabasca Basin in Canada.
The most prospective projects are actively operated on behalf of partnerships with industry leaders including Cameco Corporation, Orano Canada Inc. and IsoEnergy Ltd. Additionally, the Company holds a promising VHMS project currently optioned to and strategically positioned adjacent to and on trend with Foran Mining Corporation’s McIlvenna Bay project.
Through a robust and proactive exploration strategy, Purepoint is solidifying its position as a leading explorer in one of the globe’s most significant uranium districts.