North East Rim of the Athabasca Basin

Umfreville

Back

About Umfreville

The 100%-owned Umfreville project consists of 7 claims totalling 18,273 hectares on the northeastern edge of Canada’s Athabasca Basin. Originally covering over 60,000 hectares, the Umpfreville project has been refined to the most prospective target areas using results from airborne gravity, magnetic and electromagnetic surveys as well as soil geochemistry.

The project sits on the North-East rim of the Athabasca Basin and lies over a complex series of cross-cutting faults which are typical mineralization settings. Prospective drill targets include geophysical signatures interpreted as being representative of hydrothermal alteration coincident with anomalous uranium-in-soil geochemistry.

 

 

Umfreville Gallery

News & Media